Ghent combines a major university, a strong research base and serious manufacturing along the canal. We install datacenter racks, research compute and on-premise server rooms across the city, including the denser HPC and GPU platforms the research environment increasingly runs.
Research compute grows in bursts. A cluster gets funded, arrives, and has to go into a room that was sized years earlier for something much smaller. Without a proper installation plan the power runs out, the cooling cannot keep up and the new hardware underperforms from day one.
We plan for the growth curve rather than only today’s rack count, install the power and cooling headroom the roadmap needs, and commission dense compute under real load before handover.
An installation sized for where you are going, not only where you are now, commissioned under load and fully documented.
Every discipline we install in Ghent is delivered by the same coordinated team: datacenter installation, server rack installation, CDU and liquid cooling, Supermicro systems, white space fit-out, datacenter cooling and HVAC, electrical and power, structured cabling, fire safety, security and access control and maintenance. See all locations we cover or request a free site survey.
Yes. Ghent combines a major university, a strong research base and serious manufacturing along the canal, and we install the racks, HPC clusters and the power and cooling behind them.
That is exactly the Ghent problem. A cluster gets funded, arrives, and has to go into a room sized years earlier for something much smaller. We install power and cooling headroom for the roadmap, not only today's rack count.
Yes. Dense clusters are tested under sustained load before handover, so early failures and thermal problems surface while they are still an installation issue rather than a production outage.
Yes, where density requires it. Above roughly 40kW per rack we install CDU and direct-to-chip cooling and commission the loop under load.
Rack and HPC cluster installation, cooling and containment, power distribution with capacity headroom, and certified structured cabling.
Cost depends on rack count, power density, cooling type and cabling scope. Straightforward rack and cabling work starts in the low thousands per rack, while a full white space fit-out with power and liquid cooling runs substantially higher. You get a fixed quotation after the free site survey, with no hourly surprises.